Beaumont School

Beaumont School approached Pinnacle to tender for their science laboratory and prep room installation. The school’s brief was to create two visually stunning laboratories with more storage than previously, and DDA compliant facilities.

£0 Project value
0 Number of students
0 School founded
0 Became an Academy

The Brief

Beaumont School wanted a modern design that wouldn’t date, and was colourful without being overpowering.

The school opted for a classic pale grey theme with a twist of Caribbean blue to brighten up the laboratories and prep room. The grey was used for the TeacherWalls and StorageWalls and as a base colour in the labs with bright blue décor panels and operator chairs to bring in a pop of colour. This was paired with Speckle Icey Blue Trespa worktops which tied the grey and blue together. We also supplied zingy Jolly Lime green Gratnell trays with both fitted and mobile tray storage for easy access and space for all the laboratory equipment. Finally, Pinnacle’s Form stools were supplied with a comfortable wooden seat and extremely durable grey frame.

What we did

We also supplied one fixed and one mobile fume cupboard with docking stations for practical experiments in class involving substances with dangerous fumes. A run of IT benching was installed alongside the TeacherWalls with space underneath to allow the mobile Gratnell tray unit to fit underneath, so the technicians could prepare the resources and store them there for the next lesson.

We are proud to have worked with Beaumont School to create vibrant and inspiring workspaces that are both practical and a pleasure to work in.

Get in touch

We would love to hear from you about your project! Give us a call, send an email or use the form below, we are always keen to share our expertise and answer your questions.

020 8641 4444

Send us a message